Log House in Těptín
Log House in Těptín (2009)
The Siberian pine, which was used for the construction of the log house, has proven to be a great choice especially with a view to its structure, appearance, and exquisite properties. From an aesthetical point of view, the Siberian pine is ideal due to the minimum occurrence of knots and other wood defects. Prior to commencing with the construction work, we had to build an access road and we also had to cut down several stout trees to make space for the crane. Together with the investor, we committed ourselves to plant twice as more trees to replace the felled spruces.
After finishing the foundation slab, the arrival of the lorries with the disassembled log house was scheduled in early June 2009. The project also included the construction of a log garage. As a complimentary gift from Monivet - Tajga s.r.o., the investor received a garden gazebo built with the use of the same technology as the log house and garage. A web camera is installed on every construction site to enable the investor to monitor the progress of the construction work in real time. It is a tradition and a standard in our company to invite investors to visit the production line where they may inspect their finished log house and where they receive a model of their future home.
A visit to the production line in the Russian taiga
Mr. Benda visiting the |
Assembly of the house |
Mr. Benda receiving |
Preparatory work
Access road construction |
Completed access road |
Necessary felling |
Disaster
|
Site cleaning |
Garage strip footings |
Building the log house foundations
Reinforcement and insulation installation |
Casting |
Finished foundation slab |
Unloading of the house kit from lorries and placement of components according to precise instructions
Log house arrival |
Assistance |
Experienced operator |
Protection against damage |
Smaller parts are unloaded manually |
Machine assistance |
Accurate unloading |
Placement according to plan |
All is unloaded and positioned |
Log house assembly
Placement of basic prisms |
Gradual layering |
Almost finished first floor |
3 weeks later
Rapid assembly |
Garden gazebo |
General view |
Detail of prism joints |
Log garage |
Detail of roof truss |
Installation of roofing and surface impregnation
Log house after technical interruption and before window and door installation
|
||
Log house with installed windows and doors
Log garage after technological interruption
Continuous finishing the log cabin
Building energy efficiency certificate
Building energy efficiency certificate |